Cherreads

Chapter 210 - First Train Test

Over the past few days, the Mechanical Engineers had their hands full in assembling the locomotive together on a testing track, which was a special track that allowed them to test the locomotive, without it being needed to move. 

Before they can put it on an actual track, they had to make sure that all the mechanical components can work effectively without it breaking apart. That way, they can fix up anything that IS wrong before an actual test could happen in front of his majesty, Kant Icurus Maybale the I. 

10th of Procidens, 5018.

Ezekiel looks onward at the gigantic locomotive that lay in front of his eyes. It was built mainly out of steel and wood. The steel itself was coated with a layer of black paint, to prevent it from rusting and weakening the steel. 

Behind the steam locomotive, was the tender box. The tender box was the job of another group of mechanical engineers to build. It contained the coal and water that the steam engine would use to operate.

This is the end of Part One, download Chereads app to continue:
More Chapters